FAQs
More FAQs- What is post construction cleaning?
- I think my hard surface floor's appearance should be improved, but I'm concerned about the price. What should I do?
- How long will it take to have my floors coated with acrylic?
Construction clean-up is a service provided to brand new buildings or buildings that are being remodeled. While building contractors will do a general clean-up of construction debris, a detailed clean is required to remove all the dust and dirt left behind.
Consider the cost of non-action. Urethane not only makes your floors shiny, which gives the perception of cleanliness, but it protects your flooring investment. Floors are subject to traffic wear patterns, chemicals and stains as well as scratching. Applying a urethane finish will protect your floors and extend their life span. Compared to the cost of the typically recommended traditional acrylic floor maintenance program, urethane generally represent a cost savings for you over time.
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. When applying an acrylic finish, stripping of the old finish is usually necessary. When that’s the case, finish removal plus the application of 3 coats of finish requires 1 hour for every 150 square feet of flooring. Generally, 3 coats of finish are required to achieve the desired effect. If a floor does not require stripping, it can generally be shower scrubbed which is a procedure used for preparing a floor for receiving a new layer of finish. Once that has taken place, a floor can be recoated at anywhere from 4,000 to 6,000 square feet per hour.